Calculate your OEE for Free

Manostaxx

The text that follows is owned by the site above referred.

Here is only a small part of the article, for more please follow the link

SOURCE: http://4oee.com

4oee1

Lets use this free tool to calculate the OEE of a water filling bottle line, with the following data:

Scheduled Production Time:

5 days / 3 Shifts / 6.5 hours each shift = 97.5 hours

Planned Down Time:

Every shift will be one line change (1 hour) for other bottle dimension (product change)

1 x 3 x 5 = 15 hours x 60 = 900 min

Cycle time (number of seconds to make a bottle):

Machine speed: 600 bottles / hour -> 10 bottles / min -> 6 seconds / bottle

Total Pieces produced:

Theoretically: hours = 97.5 – 15 = 82.5 h

Bottles = 600 * 82.5 = 49 500 bottles

real : 40634 bottles

Total scrap : 1 256 bottles

Unplanned Downtime: 4 h x 60 = 240 min

Now fill the fields in the free tool on line and you get:

OEE = 80 %  which means World Class

4oee2

 

 

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s